Install 2x6 or 2x8 horizontal blocking between studs at specific heights: 36 inches: For future grab bar installation.

The most common failure in custom tiled showers is omitting the pre-slope.

Always use the provided with the valve as your guide, but ensure it sits flush with the finished tile surface , not just the backer board.

You must pitch the subfloor underneath the waterproof liner, not just the mortar bed on top of it. Without a pre-slope, water that permeates the grout collects on the flat liner, becomes stagnant, and creates a "mud sandwich" that leads to mold and liner rot. 2. Blocking for the Future

Behind the location of heavy floating stone benches or large glass door hinges. shower installation tricks.7z

Account for the "stack-up" thickness: Substrate (1/2") + Waterproofing (1/8") + Thinset (1/8") + Tile (3/8").

Corners and transitions where walls meet or the floor meets the wall are "change of plane" areas.

Calculate your tile grid from the . It is better to have a cut tile at the floor than a 1/2-inch sliver at the ceiling where it's most visible. 4. The "Flood Test" Verification

Be inspired

Be inspired

Explore our website and become inspired. When you're ready, call us for our personal touch. Install 2x6 or 2x8 horizontal blocking between studs

Price Matching

Price matching

Fareconnect.com matches all website's vacation rates. If we can book it, we will match it.

Tailor your travel

Tailor your travel

Invest in your own travel destiny. Speak with one of our travel professionals who will tailor a vacation to suit your own interest, desires and budget.

Tap into our expertise

Tap into our expertise

Our counsellors will ensure your travel experience is personalized to be the best trip experience for you. Let us put our expertise to use and make your vacation special by taking the stress out of planning your trip!

Call us for our personal touch

Call us for our personal touch

See the difference an expert will make - call Fareconnect.com: 1-866-YOR-DEAL You must pitch the subfloor underneath the waterproof

Shower Installation Tricks.7z -

Install 2x6 or 2x8 horizontal blocking between studs at specific heights: 36 inches: For future grab bar installation.

The most common failure in custom tiled showers is omitting the pre-slope.

Always use the provided with the valve as your guide, but ensure it sits flush with the finished tile surface , not just the backer board.

You must pitch the subfloor underneath the waterproof liner, not just the mortar bed on top of it. Without a pre-slope, water that permeates the grout collects on the flat liner, becomes stagnant, and creates a "mud sandwich" that leads to mold and liner rot. 2. Blocking for the Future

Behind the location of heavy floating stone benches or large glass door hinges.

Account for the "stack-up" thickness: Substrate (1/2") + Waterproofing (1/8") + Thinset (1/8") + Tile (3/8").

Corners and transitions where walls meet or the floor meets the wall are "change of plane" areas.

Calculate your tile grid from the . It is better to have a cut tile at the floor than a 1/2-inch sliver at the ceiling where it's most visible. 4. The "Flood Test" Verification