Sakz Mk 2 Shema Podkljuchenija May 2026
Knowing the exact valve model you are using will help me provide a more detailed pinout for your specific wiring.
Install at breathing height, roughly 1.5–1.8m from the floor. sakz mk 2 shema podkljuchenija
Install near the ceiling (gas is lighter than air). Knowing the exact valve model you are using
Connect the impulse valve to the unit using the dedicated "Valve" (Клапан) port. Connect the impulse valve to the unit using
Ensure the valve is installed on the gas line with the arrow pointing in the direction of the gas flow. Sensor Height:
If using a remote panel, connect it to the BSU or the last sensor in the chain to receive status signals. Plug the BSU into a standard 220V outlet .
A "Power" (Питание) LED should light up on all units, followed by a period where the system self-tests. ⚠️ Critical Safety Steps